Loading...
Loading...

Texas Panhandle
These spouting transitions were fully fabricated and installed on-site to adapt to the existing material handling system. Precision-fit design ensures minimal material spillage and optimal flow characteristics.

A replacement grain-bin top, field installation, and a maintenance access platform. Back in service in about a week.

An existing transition dismantled and rebuilt from scratch on site, all in the same day.

A new cyclone and fan installed at a Kansas grain elevator, from crane lifts and connections through a successful test.
Tell us what you need. We'll build it right.