A grain bin with a collapsed top needed a replacement before it could return to service. We measured the existing structure, fabricated a new top in the shop, transported it to the site, and installed it in the field. We also added a maintenance access platform. The bin was back in service in about a week.









An existing transition dismantled and rebuilt from scratch on site, all in the same day.

A new cyclone and fan installed at a Kansas grain elevator, from crane lifts and connections through a successful test.

On-site installation of flakers and steam chests for a California feed yard industrial project.